Re: Killington/Pico Investments
Posted: Oct 6th, '17, 06:44
Repaved bus circle at K1....
Is it too much to hope that they replaced the keg tubing at K1?
Is it too much to hope that they replaced the keg tubing at K1?
Welcome to the Killington Zone Message Board
https://www.killingtonzone.com/forums/
I've been working on this one. All you need to 4 miles of 8" Heavy Gage synthitic pipe. A 200 acre goat farm at Pic Pond and some 8" valves from Webster supply and a match.brownman wrote:How bout they allocate something to fix the stinking peak lodge..
It's been a problem from the start. Venting the system properly and to a remote location may help. Tanks at the top. Field is at the base. Huge daily volume. They have tried in the past to mitigate the oder. It's not easy to locate a commercial building at that elevation but it's not rocket science. Design flaw from the same idiots that shrank it down to one story. No cat garage as proposed originally and they had to redo the foundation. How about we play pin the ski pole on the engineer? Pass holder only game. Kind of like thunder dome. One engineer enters. No engineer leaves. ( Pull his stamp) KNAR points to the lucky poler.brownman wrote:How bout they allocate something to fix the stinking peak lodge..