well done state of vermont. this was my first trip up this year and wb - killington chunk is awesome. Why don't they extend it back to woodstock?
-
- Double Diamond Skidder
- Posts: 956
- Joined: Jan 13th, '07, 15:44
- Location: Top of Sherburne Pass, VT
Re: rt 4 Bridgewater - Killington
that new pavement plus the new bridge in woodstock took the entire summer and alot of money.keram wrote:well done state of vermont. this was my first trip up this year and wb - killington chunk is awesome. Why don't they extend it back to woodstock?
i've heard some rumors that you can expect bridgewater->woodstock next summer.
-
- Level 10K poster
- Posts: 11170
- Joined: Oct 23rd, '05, 21:08
- Location: where the figawi?
- Mister Moose
- Level 10K poster
- Posts: 11900
- Joined: Jan 4th, '05, 18:23
- Location: Waiting for the next one
-
- Site Admin
- Posts: 26946
- Joined: Nov 5th, '04, 08:42
- Location: Where the climate suits my clothes
Yep, the new pavement on parts of the Vail road and the bus route through the middle of upper Snowshed parking are things of beauty.Mister Moose wrote:Nice new stretch of pavement from Chester to Ludlow too.
Is it me, or is there something wrong when the most exciting thing going on this year is pavement?
"Abandon hope all ye who enter here"
Killington Zone
You can checkout any time you like,
but you can never leave
"The test of a first-rate intelligence is the ability to hold two opposed ideas in mind at the same time and still retain the ability to function" =
F. Scott Fitzgerald
"There's nothing more frightening than ignorance in action" - Johann Wolfgang von Goethe
Killington Zone
You can checkout any time you like,
but you can never leave
"The test of a first-rate intelligence is the ability to hold two opposed ideas in mind at the same time and still retain the ability to function" =
F. Scott Fitzgerald
"There's nothing more frightening than ignorance in action" - Johann Wolfgang von Goethe
paving, so cool... even easier now to go 35+ mph and get a ticket.Mister Moose wrote:Nice new stretch of pavement from Chester to Ludlow too.
Is it me, or is there something wrong when the most exciting thing going on this year is pavement?
mm, we'll still manage to have some fun up there this year I'm sure.....
-
- Level 10K poster
- Posts: 11170
- Joined: Oct 23rd, '05, 21:08
- Location: where the figawi?
-
- Guru Poster
- Posts: 5131
- Joined: Nov 20th, '06, 11:19
- Location: Bridgewater, VT
- Contact:
Re: rt 4 Bridgewater - Killington
I would LOVE to have the rest of rt4 paved from Bridgewater into Woodstock Village, as this is where I live, and frequently drive, But i'd much rather see the funding for that go to fixing and replacing the bridge on 100a! That entire situation is downright ridiculous, it is projected to be dealt with in another 7-10 years... Yet the temporary bridge they finally set up, (which has been set up for over a year) after the old bridge was limited to only 12 tons for a year or two, is just that a Temporary bridge, not a replacement for over a decade. Having a 1 lane bridge setup for all that live down there, or people such as myself that frequent that area, is crazy for over 12 years, just waiting for funding, and waiting for "our turn".gpetrics wrote:that new pavement plus the new bridge in woodstock took the entire summer and alot of money.keram wrote:well done state of vermont. this was my first trip up this year and wb - killington chunk is awesome. Why don't they extend it back to woodstock?
i've heard some rumors that you can expect bridgewater->woodstock next summer.
.


-
- Guru Poster
- Posts: 5131
- Joined: Nov 20th, '06, 11:19
- Location: Bridgewater, VT
- Contact:
Also, the entire stretch that got new pavement, got new guard rails! They did a lot of ditch and draining work as well, and cleaned up a large rock slide too.
We've had construction zones on rt4 the entire summer, sometimes 3 or more different construction zones set up a day, but they have transformed the road into a job well done!
We've had construction zones on rt4 the entire summer, sometimes 3 or more different construction zones set up a day, but they have transformed the road into a job well done!
.


Re: rt 4 Bridgewater - Killington
Don't feel bad, at least they finished. Rt 100 south of Ludlow has been under construction since June and is still not finished.gpetrics wrote:that new pavement plus the new bridge in woodstock took the entire summer and alot of money.keram wrote:well done state of vermont. this was my first trip up this year and wb - killington chunk is awesome. Why don't they extend it back to woodstock?
i've heard some rumors that you can expect bridgewater->woodstock next summer.
MUST STOP POSTING ! MUST STOP POSTING !
Shut up and Ski!
Why's Everybody Always Pickin on Me?
Shut up and Ski!
Why's Everybody Always Pickin on Me?
-
- Site Admin
- Posts: 8067
- Joined: Nov 5th, '04, 07:28
- Location: Between the Dark and the Daylight
- Contact:
Since the completion on the new paving the cops are having a field day writing tickets. The new road is easy to drive at 70 and people are driving it at that speed. The sheriffs dept and the staties are making their quota in the first couple of days in a month.
Cogito, ergo sum
Sometimes it is that simple.


Sometimes it is that simple.